MoloWorks account

Welcome back.

Sign in to continue where you left off.

Forgot password?

New to MoloWorks?

Shared skills · ML-C01

COURSE PREVIEW

How to use a breadboard

Make a connection. Change it. Explain why it works. Start with the hidden map beneath the holes.

  • 15 min lesson
  • 4:20 video
  • First-time builders

MaterialsBreadboardJumper wiresPush-button moduleMultimeter (continuity check)

Practice with the power off. Keep USB, batteries, and all other power disconnected while wiring.

Watch the lessonEnglish · Captions in video

Understand the connections

Make a connection. Change it. Explain why it works. A breadboard holds parts and joins selected holes, so you can experiment without soldering.

01 Read the hidden connection map.02 Wire a button with jumpers.03 Check the layout before power.

Meet your tools

No code needed
Solderless breadboard

Solderless breadboard

Metal clips inside grip pins and connect groups of holes.

Three jumper-wire types

Male = pin; female = socket.

Male–male jumper: pin at one end, pin at the otherpinpin
Male–maleBoard holes ↔ board holes
Female–female jumper: socket at one end, socket at the othersocketsocket
Female–femaleHeader pins ↔ header pins
Male–female jumper: pin at one end, socket at the otherpinsocket
Male–femaleHeader pin ↔ breadboard
Push-button module, front view with the button above the pins. Left to right: VCC, OUT, GND.VCCOUTGND

Push-button module

VCC → 3.3 V   OUT → GPIO input
GND → GND

Front view: button above pins. Female sockets fit its header pins.

Look beneath the holes

Typical layout
Typical breadboard: each five-hole row is connected; the center gap separates the two sides. Rail breaks vary by board.+−+−ABCDEFGHIJ8899101011111212131314141515161617171818TEACHING VIEW · ROWS 8–18 · EXAMPLE SPLIT RAILS

Colored bands represent metal connections inside the board. This is a teaching diagram; the rail breaks and row count on your board may differ.

Five holes, one connectionOn one side, A10–E10 are joined. A11–E11 are a different group. Neighboring rows are separate.
The gap separates the sidesE10 and F10 are not connected. F10–J10 form their own group, even though the row number matches.

Check the power rails. Markings supply no power; some rails are split. Check continuity with power off. To share 3.3 V across a split, bridge + → + and − → − with two male–male jumpers. Never bridge + to −.

Check. Bridge. Share.

The long + and − rails distribute power. Some boards split these strips in the middle, so a supply connected at the top may not reach the bottom.

Disconnect USB, batteries, and other supplies before checking continuity.

Need both rail halves?

Example split rails

Before bridging: separate sections

Example split rails: the upper and lower sections are not connected without jumper bridges.+−TopBottomNo jumperhalves separate

A split breaks the internal connection. Power at the top does not cross that break automatically.

After bridging: one shared supply

Across a split, use one male–male jumper from upper positive to lower positive and another from upper ground to lower ground. Never join positive and negative.+−TopBottom2 × male–malesame polarity

Use two male–male jumpers: upper + → lower + and upper − → lower −. Both halves can share 3.3 V and GND.

Check your actual board

Power off first

1 / Test the + rail

Use a multimeter in continuity mode. Touch one probe to an upper + hole and the other to a lower + hole.

2 / Test the − rail

Repeat on the upper and lower − sections. Check each rail separately; do not assume they match.

3 / Bridge only if needed

If the sections are not connected and you need both, add same-polarity bridges. Connected rails need no bridge.

Painted stripes are helpful labels. A continuity check confirms the electrical connection.

Keep the rails separate

Red (+) and blue (−) identify different rails. They are not connected to each other. The rails on the opposite side of the board are also separate.

One source is enough: correctly bridged halves share the same 3.3 V supply. You do not need a second supply just because the rail is split.

Never bridge + to −. That would short the supply. Bridge + to + and − to − only.

Can you explain it?

  1. A split rail is powered at the top. Is the bottom automatically connected?
  2. Which jumper type connects holes across the split?
  3. Do bridged halves need separate supplies?

Answers: 1. No—the split separates them.
2. Male–male, one for each polarity.
3. No—they can share one source.

A jumper is needed only when the sections are separate and you want to use both. Check first, then wire.

Build. Trace. Change.

Use the printed letters and numbers to find each hole. Insert one pin per hole, gently and firmly. These are connections to trace, not a powered circuit.

Keep USB, batteries, and all other power disconnected.

1

Join two groups on the left

Use male–male jumpers. Place a green wire from a10 → a15. E10 and E15 now share a connection. The right side is still separate. Pull the plastic head when removing a wire.

2   Bridge the center gap

Add an orange jumper from e15 → f15. Keep the green jumper in place.

With a jumper from A10 to A15 and another from E15 to F15, row 10 left, row 15 left, and row 15 right share a connection.ABCDEFGHIJ101516Rows 11–14 omitted

Trace it: E10 now connects to J15.
e10 → a10 → a15 → e15 → f15 → j15

3   Move just one endpoint

Leave E15 fixed. Move the orange end from f15 → f16. The dashed line shows its old position.

After moving the orange endpoint to F16, the shared connection reaches row 16 on the right instead of row 15.ABCDEFGHIJ101516Rows 11–14 omitted

What changed? E10 now connects to J16.
J15 is separate again. One row matters.

The shaded groups show predicted connectivity, not flowing current or a meter reading. The center gap stays isolated wherever no wire bridges it.

Before any later power-up

  • Disconnect power before moving a wire.
  • Read every coordinate; check for loose pins, bent pins, or unintended shared groups.
  • Rule out unintended power-to-ground links. Check any rail sections you plan to use.
  • Confirm voltage and pin labels. This button: VCC → 3.3 V; OUT → GPIO input; GND → GND. Each pin needs a separate connected group.

Can you explain it?

  1. On an empty board, are A10 and E10 connected?
  2. On an empty board, are E10 and F10 connected?
  3. Do red and blue rail markings supply power?

Answers: 1. Yes—same five-hole group.
2. No—the gap separates them.
3. No—a suitable source supplies power.

Success: Trace both layouts aloud and explain why J15 becomes separate after the move. Finish with the practice unpowered.

Your 15-minute foundation route   Introduction 2 min · Connection rules 4 min · Practice 6 min · Checklist + review 3 min

Wire the button.

Remove the previous practice jumpers. Use three male–female leads on the button: sockets on its pins, male ends in the breadboard. Match controller leads to its connectors.

Keep USB, batteries, and all other power disconnected while wiring.

One complete connection

3.3 V · Shared ground
Button and breadboard wiring — 3.3 VMoloWorksML-C01 / BUTTON WIRINGConnect a button to a breadboard3.3 V supply · OUT to a GPIO input · Shared groundLEFT + = 3.3 V / LEFT − = GNDABCDEFGHIJ+−+−8899101011111212A10–E10: one connected groupUnused railsBUTTON MODULECONTROLLERESP32 / 3.3 V logic3V3GPIO inputGNDGNDOUTVCCa10e10Pins face right in this view.Top to bottom: GND, OUT, VCC.Use male–female jumpers:socket → module; pin → breadboard.Choose a GPIO input for your project.Connect controller GND to the − rail.COMMON GROUNDFilled endpoints connect. Wire crossings without dots do not.01 / POWERVCC → + rail (3.3 V)Controller 3V3 powers the same + rail.02 / SIGNALOUT → A10; E10 → GPIO inputA10 and E10 share the internal strip.03 / GROUNDGND → − railController GND joins the same − rail.Switch power off before wiring. Use a continuous rail segment; check any breaks before power-up.

Use one checked, continuous segment of the left + and − rails. Filled endpoints connect; crossings without dots do not.

1 / Set up the rails

Controller 3V3 → +.
Controller GND → −.
All parts share this ground.

2 / Connect button power

Button VCC → + (3.3 V).
Button GND → −.
Pull connector heads, not wires.

3 / Connect the signal

Button OUT → A10.
E10 → GPIO input.
A10 and E10 share one strip.

Before power-up

  • Supply disconnected while you inspect or rewire.
  • VCC uses 3.3 V; the button and controller share GND.
  • OUT and the GPIO jumper use the same five-hole group. Check printed coordinates and firm pins.
  • No unintended + to − connection. Finish this practice with power disconnected.

Quick check: OUT goes to a GPIO input.
VCC uses 3.3 V. The button and controller share GND.

Trace the button connections

Power: controller 3V3 → + rail → button VCC.

Ground: controller GND → − rail → button GND.

Signal: button OUT → A10 → E10 → GPIO input.

A10 and E10 share one internal strip. A11 is a separate group. Trace every endpoint in the completed layout before applying power.

Practice sequence   Understand the map → complete the jumper exercise → remove those wires → build and inspect the button layout.

Keep your reference

Keep the lesson beside your practice.

Download the PDF to keep the diagrams, commands, and checkpoints close at hand. Return to the first missing observation when a step does not match.

Lesson diagram

Scroll across the diagram to inspect each connection.

Contact QR code

Open contact